Highly elastic joints with a rubber-metal toroidal elastic element are designed to transfer torque between units, for example, between the engine and the pump or between the engine and the generator.
Joints have high compensating and damping properties, can reduce the level of vibration units, increase their durability, simplify and reduce the cost of maintenance.
Highly elastic joints allow to considerably simplify installation, for example, pump plants, so as they compensate the assembly and working radial displacements of shafts being connected, up to 1 mm, and axial displacements up to 2 mm. The compensating capacity of the highly elastic joints in times more than at widespread socket-bolt and gear joints.
Unlike socket-bolt and gear couplings, the offered joints have no rubbing, wearing out parts, so their durability is high, they do not demand any service throughout the whole operation life which, as practice shows, makes up to 10–15 years.
For the simplification of installation, the elastic element is produced split into two pieces. Non-split elastic elements are also produced. In the elastic elements of the joints design special sorts of rubbers which have high elasticity and cyclic durability are used. For obtaining of demanded by the customer torsional rigidity of the joint sorts of rubbers which have various elasticity are used.
The modern technology of coupling of rubber with metal has allowed to reach such durability of coupling of rubber with metal that surpasses durability of the rubber itself. In the process of joints’ manufacture the index of strength of rubber with metal coupling is constantly supervised.
Joints are produced according to the TU 4171-005-23770232-2004.
Energy. Industry. They are installed to reduce vibration when transferring rotation between units with large radial displacements.
Delivery of production is carried out to any point of Russia, the near and far abroad, the following transport companies: "zheldorekspeditsiya", "Autotrading", "Sherl TK", "RATEK", "Energy", "Business Lines".
Shipment of production is made after receipt of an advance payment in the following terms:
If customs clearance is necessary, the shipment period is increased by 2-3 working days.